About the project

Work is underway. ODOT is repaving the nine-mile stretch of roadway on Interestate 205 between the Interstate 5 interchange in Tualatin and the south end of the Abernethy Bridge in West Linn. The pavement on I-205 in this area, last repaved in 2006, is now deteriorating and in need of repair.

The project is scheduled to be completed by the end of 2017.

Project details

The project includes these key elements:

  • ADA-compliant sidewalk curb ramp improvements on 10th Street (between 8th Court and Blankenship) in West Linn. While the curb ramps on the west side of 10th Street are under construction, the sidewalk will close and pedestrians will use a protected walkway on the east side sidewalk.
  • Resurfacing the pavement on 10th Street under I-205.
  • Repaving the Oregon 43 interchange loop and improving sidewalk curb ramps to meet ADA standards. While the curb ramps on the west side of the loop are under construction, the sidewalk will close and pedestrians will use the east side sidewalk.
  • Resurfacing the I-205 bridges that cross over SW Woodbine Road and SW Borland Road.
  • Replacing existing rumble strips on I-205.

Weekly construction update

Saturday, February 16 to Friday, February 23

No traffic impacts.

Overview: Construction impacts

Sidewalk curb ramp improvement work will take place during the day. All other work will take place primarily at night and will include multiple lane closures. Night work is necessary to keep daytime traffic flowing on I-205. ODOT’s noise hotline is staffed 24 hours a day to help resolve any noise problems or incidents. The hotline number is 503-412-2325. This website is updated weekly. Sign up for the mailing list to receive project updates.